CDM Bazaar logo
  UNFCCC logo URC logo
    Register  | Login
 
Home    |    About CDM Bazaar    |    How to use the Bazaar    |    Contact    |    Legal    |    Glossary    |    RSS
 
Navigation:   
 
Sellers
Buyers
Service Providers
CDM Project Ideas
Announcements
Latest seller profiles
2017/02/28 | Shyam Metalics and Energy...
2016/12/07 | Pasteurizadora Rica
2016/11/28 | K.Raheja Corp.
2016/10/03 | DANS ENERGY PVT. LTD.
2016/06/28 | BERVIAC
> See all seller profiles
 
Company Profile
>Print page
DANS ENERGY PVT. LTD.

We would like to introduce our self as 96 MW Jorethang Loop Hydro Electric project in the state of Sikkim, India. We are a CDM registered project (11th Feb 2008) for the total period of 21 years, the first crediting period is for 7 years starting from 1st Jan’12 to 31st Dec’18, Commissioning of the project was achieved on 30th Sep’15. Currently, our project don’t have any long term tie-up/agreement with distribution companies for selling generated power. Currently, we are selling power in the open market which is fetching us a low price and making the project difficult to operate. CER revenues is vital for the continued operations of the project.
We are willing to sell 3,35,652 CER’s by March'2017

Country of origin
India

CDM Project(s)

Activity 1
DANS ENERGY PVT. LTD.
The Jorethang Loop Hydroelectric project (JLHEP) is developed by DANS Energy Private Ltd (DANS Energy) on the Rangit River in the state of Sikkim, India. The Rangit River is a tributary of the Teesta River, which is the main river traversing the state of Sikkim. The project will have an installed capacity of 96 MW, and will generate approximately 444.03 GWh (gross) per annum. The project will involve the construction of a diversion barrage, 108 m in length and 13m in height, which will create a small reservoir of approximately 10.1 ha. The main purpose of the project is to use the hydro potential of the Rangit River to generate zero emission electricity. The electricity generated will be exported to the Eastern Regional grid through the Eastern Regional Load Dispatch Centre (ERLDC). Contribution to Sustainable Development: The JLHEP will contribute strongly to the sustainable development of the region and surrounding areas in the following ways: • The generation of electricity by the project will not result in the emission of greenhouse gases to the atmosphere. • The electricity to be generated displaces grid-sourced electricity that is dominated by non-renewable fossil fuel resources, thereby reducing the carbon intensity of the Eastern Regional grid. • The project will result in a reduction in air borne pollutants, such as oxides of nitrogen, oxides of sulphur, carbon monoxide and particulates, through a reduction in the combustion of fossil fuels. • The project will generate local employment, on a temporary basis during the construction phase, with more permanent on-going employment during the operational phase. • The project will encourage the demand for materials, spare parts, equipment and on-going consumables. • The project will not compromise access to the river resources for downstream users as the Raman River flows into the Rangit River approximately 4 kilometres downstream of the proposed diversion barrage, and two other streams, Ramam Khola and Chhoti Rangit flow into the Rangit River within this 4 kilometre stretch. In addition provisions have been made for approximately 0.3 cumecs of sacrificial discharge throughout the year. To ensure there is no negative impact on local fish populations, a hatchery (including hatchery, nursing ponds, rearing ponds and stocking ponds) is proposed to be built in the vicinity of Rangit River. • A greenbelt of approximately 24.74 ha will be created around the reservoir, to mitigate soil erosion and prevent landslips. • The project will not involve the construction of any major roads, except for a small length of approach road and minor link roads. The project will carry out maintenance and upgrade of existing roads, which will improve access to the area whilst limiting environmental disturbance. • Twelve percent of the total electricity generated will be provided free to the Sikkim State Government as a royalty. • Local villages partially depend on firewood for their daily energy needs, which can lead to adverse ecological impacts, such as forest degradation, soil erosion and reduction in soil fertility. Increased availability and reliability of power supply from this project to the villages will reduce the need for firewood.
https://cdm.unfccc.int/PRCContainer/DB/prcp649614778/view

Activity 2




Countries of operation
India

User comments
Please register or log in to post comments.
Contact information
DANS ENERGY PVT. LTD.
5th Floor, DLF Building No. 8, Tower C, DLF Cyber City, Phase – II Gurgaon – 122 002, Haryana, INDIA
India

Contact: Shikha Gupta
0124-4696336
(register or log in to view email address)

Market focus


 
  Disclaimer
The originator of information that has been uploaded or posted on, or transmitted to, this website bears sole responsibility for the content. UNFCCC CDM Bazaar reserves the right to monitor and/or pre-screen content, but does not endorse, approve or control content and does not guarantee the accuracy or quality of the content. Visitors bear sole responsibility for evaluating the accuracy, completeness or usefulness of any content. UNFCCC CDM Bazaar makes no warranty that the website will be uninterrupted, timely, secure, or error free; nor does UNFCCC CDM Bazaar make any warranty as to the results that may be obtained from use of the website. Under no circumstances will UNFCCC CDM Bazaar be liable for any loss or damage caused by reliance on any content found on the website.